192nd Street - West Dodge Road to Harney Street (Douglas County Project)

About the Project

The 192nd Street Improvement project will remove the existing two-lane rural roadway section and replace it with a six-lane urban section and a 34-foot median between Harney Street and West Dodge Road. South of Harney Street, the six-lane section will transition to a four-lane section before tying into the existing two-lane, rural section just north of Leavenworth Street. Drop lanes will be utilized at the West Dodge access ramps to tie into the existing four-lane urban section just north of the access ramps. An additional northbound drop lane will be constructed north from the West Dodge Road off-ramp, tying into the existing right turn lane for HWS Cleveland Boulevard.
 
The roadway will be accompanied by sidewalks on both sides of 192nd Street, with a multi-use trail extending north along the west side of 192nd Street for a future connection to the West Dodge Interchange. A pedestrian crossing will be installed at the new Farnam Street intersection that will provide refuge in the wider median section. Storm sewer, retaining walls, and utilities will be also be constructed during this project to accommodate any future developments or expansion of the corridor.

click on image to enlarge

Project Schedule

Winter 2019-2020: Utility and sewer work. Retaining Wall construction.
 
Spring 2020: Northbound lane construction.
 
Summer 2020: Southbound lane construction. Expect lane shifts.
 
Fall 2020: Landscaping and sidewalk construction, project completion. Expect lane shifts.
 

Construction Updates

 
December 3, 2020
On Friday, December 4, 2020, 192nd Street will be CLOSED during the overnight hours from 8:00 p.m. to 6:00 a.m. to install traffic signals at the Harney Street intersection. The road will be re-opened to traffic the morning of Saturday, December 5, 2020.
 
November 16, 2020
On Friday, November 20, 2020, 192nd Street will be CLOSED during the overnight hours to install traffic signals at the Burke Street intersection. The road will be re-opened to traffic the morning of Saturday, November 21, 2020.
 
September 29, 2020
On Wednesday, September 30, 2020, traffic on 192nd Street will be split from the two-way traffic on the northbound lanes to one-lane traffic on both the southbound and northbound lanes. Expect lane shifts in each direction as work to complete the pavement striping will occur. Some turning movements near the West Dodge Interchange may be temporarily restricted due to ramp and intersection construction. Please continue to be aware of construction vehicles entering and exiting the construction area.
 
July 1, 2020
On Thursday, July 9, 2020, traffic on 192nd Street will be shifted to the newly constructed lanes for both the northbound and southbound movements. Traffic will be two-way on the northbound lanes under West Dodge Road. Some turning movements near the West Dodge Interchange may be temporarily restricted due to ramp and intersection construction. Please continue to be aware of construction vehicles entering and exiting the construction area.
 
June 12, 2020
On Saturday, June 13, 2020, 192nd Street will be closed to traffic between Leavenworth Street and West Dodge Road from the hours of 6 AM to 3 PM.
 
March 19, 2020
Effective Monday, March 23, 2020, the southbound left turn from 192nd Street onto West Dodge Road will not be permitted as required by the reconstruction of the ramp terminal onto Dodge and associated utility work in the area. Traffic will be shifted to two-way movements on the southbound lanes under West Dodge Road.

 Contact Us

  • To provide your input about a specific location within the project area, visit the City Map.

 Queries

Ryan Ruff
Douglas County Engineer's Office
402-444-3289