Powered by Google TranslateTranslate
 
Powered by Google TranslateTranslate
 
Powered by Google TranslateTranslate
 
Powered by Google TranslateTranslate

24th Street Corridor Study (COMPLETED)

About the Project

The Central Corridor of 24th Street, Mason Street to Cass Street, is intended to provide linkage to the north and south with improved connectivity for all modes of transportation. The purpose of this project is to analyze the current use and determine how to best use the existing street right-of-way to accommodate all users including vehicles, transit, bicycles, pedestrians and on-street parking now and in the future.
24th Street Corridor Study

click on image to enlarge

RESOURCE MATERIALS