Blondo St. Bridge Over Big Papillion Creek Approach Replacement (OPW 54107) (COMPLETED)

About the Project

This project involves the demolition of the existing bridge approaches to the Blondo Street bridge at approximately 116 th Street and replacing them with  new approach slabs. The existing approaches were constructed concurrently with the bridge in 1998 and have experienced significant settlement and deterioration. Several asphalt wedges have been places to accommodate the settlement but have also failed. The new approach slabs should more  smoothly accomplish the grade change between the street and bridge deck.

click on image to enlarge

Project Schedule

 Contact Us

  • To submit a comment or receive project updates, join the project mailing list through our contact form.
  • To provide your input about a specific location within the project area, visit the City Map.

 Queries

Everett Owen, PE
Project Manager, Public Works Division 
402-444-5220