F Street, 156th Street to 144th Street Pavement Improvements & Panel Repair (OPW 54220)

About the Project

The existing pavement surface on F Street from 148th Street to 156th Street has deteriorated over the years and has reached the end of its serviceable life. This project will reconstruct
the roadway to a new concrete pavement section with curb and gutter, construction of an enclosed underground storm sewer system, and construction of a sidewalk and ADA curb ramps.  Individual defective concrete pavements panels will be replaced between 144th Street to 148th Street. 
 
At this time, it is anticipated the reconstruction activity will occur in two separate segments, the portion west of the 150th Plaza and the portion east of 150th Plaza. Each of these segments will occur in a separate timeframe. Each phase will require full roadway closure of that section of F Street.  The individual pavement repairs between 144th Street and 156th Street will be completed with lane restrictions.

Project Schedule

F STREET, 156TH ST TO 144TH ST- PAVEMENT IMPROVEMENTS & PANEL REPAIR Schedule-01.png

 

Events & Updates

  • A Public Information Open House was held on Monday, April 22, 2024, at the Community Covenant Church, 15770 Q St, materials from the meeting can be found below: 

 Contact Us

  • To submit a comment or receive project updates, join the project mailing list through our contact form.
  • To provide your input about a specific location within the project area, visit the City Map.

 Queries

Sean Selig
Project Manager, Public Works Division 
City of Omaha
402-444-5220