About the Project
The existing pavement surface on F Street from 148th Street to 156th Street has deteriorated over the years and has reached the end of its serviceable life. This project will reconstruct
the roadway to a new concrete pavement section with curb and gutter, construction of an enclosed underground storm sewer system, and construction of a sidewalk and ADA curb ramps. Individual defective concrete pavements panels will be replaced between 144th Street to 148th Street.
At this time, it is anticipated the reconstruction activity will occur in two separate segments, the portion west of the 150th Plaza and the portion east of 150th Plaza. Each of these segments will occur in a separate timeframe. Each phase will require full roadway closure of that section of F Street. The individual pavement repairs between 144th Street and 156th Street will be completed with lane restrictions.