Saddle Creek Road Streetscape Improvement Project (OPW 54540)

About the Project

Located along Saddle Creek Road from 50th Street to Hamilton Street, the proposed project will construct new sidewalks, pedestrian-scale lighting, landscaping, and on-street parallel parking. Additionally, space will be created for public amenities such as benches and bicycle parking. The goal of this project is to make enhancements to the area's current streetscape and improve the overall safety of the corridor.

Project Schedule

  • Conceptual Design – Summer/Fall 2023
  • Preliminary Design – Winter 2023/2024
  • Final Design – Spring 2024
  • Utility Relocation – Spring/Summer 2024
  • Construction Begins – Summer 2024,
  • Phase 1 – Summer/Fall 2024
  • Phase 2 – Spring 2025
  • Construction Ends – Summer 2025
Events
A public open house was held Tuesday, February 6, 2024 from 6:30 - 7:30 PM at The Omar (4383 Nicholas St Suite 200, Omaha, NE 68131). This meeting was held to provide information regarding the project, and to receive the public’s input. For those unable to attend, meeting materials are available in the next section below:
Public Open House Meeting Materials, February 6th 2024: 
 

 Contact Us

  • To submit a comment or receive project updates, join the project mailing list through our Contact Form.
  • To provide your input about a specific location within the project area, visit the City Map.

 Queries

Kristi Evans, P.E.
Project Manager, Public Works Division
City of Omaha
402-444-5220